The mission concerns the study of an interchange complex at the crossing RR33E2 / La Goulette - Kram - Gammarth expressway (RR23). The studies include the construction of a 243m long prestressed concrete slab bridge-type viaduct, the construction of the 3Km long side tracks, the widening of the RR23 into 2x3 separate tracks over 700m, the construction of (05) hydraulic structures and of drainage, the development of (02) flat intersections, drainage and public lighting of the roads and the installation of safety devices.

Services performed

Preliminary design Studies: APS, APD and DAO

Country

Tunisia

Client

Ministry of Equipment, Housing and Regional Planning
Directorate General of Bridges and Roads – DGPC

Date

Project cost

28 000 000 TND INCLUDING TAX