Projects

Construction works for the crossing of the Medjerda river on the MC50 at PK 66+600 in the governorate of l’Ariana

Our mission is the development of execution design relating to the construction works of the crossing of the Medjerda river on the MC50 at PK 66 + 600 in the governorate of L’ARIANA.

Consistency of studies:

  • Road works including drainage of the MC50 on either side of the bridge;
  • Detailed design of the large hydraulic structure of the VIPP type of lengths of 88m each. The deck is made up of prestressed beams with a span of 28m. The structures are built on posts.

Services performed

Execution design

Country

Tunisia

Client

SOMATRA

Date